After-sales Service: | on-Site Installation |
---|---|
Warranty: | 12 Months |
Certification: | CE, ISO |
Samples: |
Gypsum Block
|
---|
Customization: |
---|
Shipping Cost:
Estimated freight per unit. |
about shipping cost and estimated delivery time. |
---|
Payment Method: | |
---|---|
Initial Payment Full Payment |
Currency: | US$ |
---|
Return&refunds: | You can apply for a refund up to 30 days after receipt of the products. |
---|
Suppliers with verified business licenses
Qty/mould | 15pcs/mould (hollow block 400*200*200mm) |
Molding cycle | 15s |
Rated pressure | 31MPa |
Main vibration | Platform vibration |
Vibration frequency | 2800-4500 r/m |
Power | 78.5kw |
Pallet size | 1300x1100mm |
Dimension | 11500x2350x2950mm |
Host machine weight | 17500kg |
Factory Area | 3000m² |
hydraulic mixer
1)High-speed mixing, uniform, increase gypsum strength
2)Mix it into a sticky shape and do not burn the motor.
The use of hydraulic mixing, complete sets of equipment installed power of about 24.5KW to save electricity
12 Years experience in oversea market projects service
What we provide is not ONLY the machine BUT the whole system.
Yurui (Shandong) Machinery Co., Ltd, is an enterprise integrating gypsum projects R&D, design, Manufacturing, exportation, installation, and commissioning.1) Pre-sales: Full cooperation with pre-preparation work
2) In-sales: On-time reporting of production progress
3) After-Sales: Lifetime & 24h technical support
Q: How long is the warranty of your equipment?
A: 1 year
Q: Do you supply spare parts?
A: Excellent easy broken parts support for buyers. Easy broken parts guarantee for one year.
Q: Will you provide training?
A: The training is free of charge , and our engineer will be on duty to train your worker.
Q: How will you provide installation&commissioning?
A: Will provide 2~8 persons(adjustable according to the degree of automatic )for installation. Engineers team will go with your project.
Q:How long time for the installation and commissioning?
A: depend on configuration normally only need 15-25 days. Including workers training.
Suppliers with verified business licenses