Customization: | Available |
---|---|
After-sales Service: | on-Site Installation |
Warranty: | 1 Year |
Still deciding? Get samples of US$ 1/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Since the Epidemic happens, there are some changes in the market, the shipping market is becoming crazy, and the delivery cost to some countries are raising price dramatically, especially in the Middle East, Africa, and South America.
*100% success rate of domestic and foreign projects
*Project site visit and video viewing visit available
* Maximum capacity can reach 400,000 to 500,000ton per year
*Over 15 years of experience in oversea market project service experience
1
|
Production capacity
|
2million~30 million square meter per year.
Normally Production capacity based on thickness 9.5 mm
|
2
|
Working time
|
Based on 24 h per day ,300 days per year.
|
3
|
Final product variety
|
(1)Common paper-faced plasterboard
|
(2)Fire resistance paper-covered plasterboard,
|
||
(3)Water resistance paper-covered plasterboard.
|
||
4
|
|
Board length:2000--3600mm
|
Board width:1200mm,1220mm
|
||
Board thickness:8--25mm
|
||
5
|
Fuel type
|
Heavy Oil , Diesel,Natural Gas, Wood
Normal customers could choose the type that is cheaper and easy to get locally.
|
6
|
|
1-Hot air technology
2-Hot oil technology
|
Raw materials | Item | Specification |
Calcined gypsum powder |
Fineness |
0.2mm,<10% 0.2mm,Remnant<10% |
Initial set time |
3.5-5.5 3.5-5.5 minutes |
|
Final set time |
7.5-10.5 7.5-10.5 minutes |
|
Crystal water |
4.5%-5% | |
Half-water gypsum powder |
>65% | |
(2) Bending strength (2 hours) |
1.8 Mpa | |
Paper |
Weight |
190-220g/ |
Thickness |
0.36-0.4mm | |
Air permeability |
0.85-1.6μm/pas | |
(Cobb) Water absorption( Cobb ) |
15-30g/ | |
Tensile strength |
12.5 KN/m,3.5 KN/m Portrait 12.5 KN/m, transverse 3.5 KN/m |
|
Transverse expansion and contraction |
<2% | |
Moisture |
10%±2 | |
Denaturized starch |
Content of the starch |
>70% |
Moisture | 11%-13% | |
PH | 6.5-7.5 | |
Protein | <0.3% | |
20ºC-40ºC Solubility in 20ºC-40ºC water |
73%-78% | |
Foaming agent |
Condensate |
>30% |
Ligarine |
<3% | |
Inorganic salts |
>2.5% | |
PH | 7-9 | |
water | PH | 6.5-7.5 |
Customer Visit China and Abroad project
Installation &commissioning service
Q: How long is the warranty of your equipment?
A: 1 year
Q: Do you supply spare parts?
A: Excellent easy broken parts support for buyers. Easy broken parts guarantee for one year.
Q: Will you provide training?
A: The training is free of charge , and our engineer will be on duty to train your worker.
Q: How will you provide installation&commissioning?
A: Will provide 2~8 persons(adjustable according to the degree of automatic )for installation. Engineers team will go with your project.
Q:How long time for the installation and commissioning?
A: depend on configuration normally only need 15-25 days. Including workers training.