Equipment details:
Product Name |
Gypsum Powder Production line |
Annual capacity |
15,000 to 500,000 tons |
Working time |
24h/day ,300day/year |
Raw Material Gypsum Type |
Natural gypsum mineral or chemical gypsum |
Gypsum powder Mesh |
Within 220 meshes |
Heating method |
Hot air boiling furnace or rotary kiln |
Application of the powder |
Building material like to produce gypsum board , To make plaster of paris , to make gypsum cornice or ceiling |
Degree of automation |
Fully automatic |
Final product specification |
Gypsum powder |
Fuel for the heating system |
natural gas,coal,diesel,heavy oil,light oil etc |
Packing method available |
- packing machine 1-2 mouth
- Rotary kiln packing machine
- 1ton bag packing machine
|
Finished powder bending strength |
2.7Mpa |
Finished powder compressive strength |
5Mpa |
Crushing system
The crushing system can crush large ore from mine mining to an average granularity of 25 mm by one time, is an ideal version of traditional ways of two and three stage crushing
Cacination system
Calcination system is the key link in the production and processing of gypsum powder, and it is also the most difficult part to master. According to this situation, we have developed a new generation of gypsum powder suitable for various application - a new type of hot air boiling furnace
Features of this hot air boiling furnace technology
1-Reduce investment
2-Reduce maintenance cost
3-Gypsum powder quality adjustable
4-The installation period is short and area is small
5-energy and power saving
Milling system
The mill system will make the gypsum particles into gypsum powder,through the combined action of analysis machine and fan, this mill can meet the fineness of grinding requirements from different users
Storage system
Calcination system is the key link in the production and processing of gypsum powder, and it is also the most difficult part to master. According to this situation, we have developed a new generation of gypsum powder suitable for various application - a new type of hot air boiling furnace
Why choose Yurui ?
1,Continuous production: adopt soft starter,to make sure the continuous and stable production .
2, stable quality: adopt latest hot air boiling furnace technology and cooling system , improve the quality of the product.
3, energy-saving and stable: core technology cooling system and waste heat utilization system.
4, equipment performance is high : adopt bag dust collector, frequency converter , PLC Mitsubishi and the national standard cable
5, the control is sample : use computer display, PLC control.
6. installation and commissioning period is short ,within 3-7 days
Cases for your reference:
We have a customer in Indonesia who own 3 factories.He bought 4 sets gypsum powder line and 4 sets gypsum board line from 2008 yeas to 2018 year
In 2008 year: gypsum powder line 50000 tons/year + gypsum board line 8000000 sqm/year
In 2009 year:gypsum powder line 150000 tons/year + gypsum board line 10000000 sqm /year
In 2012 year:gypsum powder line 150000 tons/year + gypsum board line 10000000 sqm /year
In 2018 year:gypsum powder line 300000 tons/year + gypsum board line 20000000 sqm /year
This large and long investment involves small,middle and large capacity.The largest capacity even exceed local enterprise KNAUF.All the total 8 production lines are running well now.
Chemical gypsum powder&POP project
This is our chemical gypsum powder project in South Africa. The customer is a well-known local building material supplier. The owner has been in the phosphogypsum industry for more than 40 years.
project capacity:
Gypsum powder line: 50000 tons/year
Plaster of Paris line: 30000ton /year
1-Project name:Natural gypsum powder&board project
2-Project capacity:
Gypsum powder line:150000ton
Gypsum board line : 10Million sqm/year
3-Project technology:hot air technology
For this project, our Chief engineer has only taken 5 days to run the whole gypsum powder production line and put it into production after installation, and our customer also felt surprised on it. While some manufacturers need more than one month to finish it or even some are unable to run it for production.
We have been deeply engaged in the field since 1998, setting up 100+gypsum projects domestic and abroad. Our engineers group who only serve for YURUI left a full footprint over Africa, Asia, and south America, total of 20+countries. We hold different projects in each area, offering case visiting on-site.