Customization: | Available |
---|---|
After-sales Service: | on-Site Installation&Workers Training |
Warranty: | 12 Months Warranty & Whole Life Service |
Still deciding? Get samples of US$ 1/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment methods: | |
---|---|
Support payment in USD |
Secure payments: | Every payment you make at Made-in-china.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Product Name | Chemical Gypsum Powder Production line |
Annual capacity | 15,000 to 500,000 tons |
Working time | 24h/day ,300day/year |
Raw Material Gypsum Type | Natural gypsum ore |
Gypsum powder Mesh | Within 220 meshes |
Heating method | Hot air boiling furnace or rotary kiln |
Application of the powder | Building material like to produce gypsum board , To make plaster of paris , to make gypsum cornice or ceiling |
Degree of automation | Fully automatic |
Final product specification | Gypsum powder |
Fuel for the heating system | Natural gas,coal,diesel,heavy oil,light oil etc |
Finished powder bending strength | 2.7 Mpa |
Finished powder compressive strength | 5 Mpa |
The 2nd step: Pre-Drying
From the belt conveyor come into the hammer dryer ,(later i will show you the pictures)as you see for the chemical gypsum ,the two point is very important ,the surface water and the crystal water .so in the hammer dryer is used to take the surface water out , in the hammer dryer the temperature is very high around 400-500 degree ,and why have this step ? some factory don't have this step ,this step can make the gypsum liquidity. And then to the next step to the boiling furnace ,it can easy to calcinate ,so we have this step .
This part is ball mill, because the chemical powder has quality problem, through modification mill, it can change the characteristic of chemical gypsum powder, make it similar to natural gypsum.
Our advantages of chemical gypsum production line:
Case 2: Chemical gypsum powder&POP project This is our chemical gypsum powder project in South Africa. The customer is a well-known local building material supplier. The owner has been in the phosphogypsum industry for more than 40 years. project capacity: Gypsum powder line: 50000 tons/year Plaster of Paris line: 30000ton /year |
Case 3: project name:Chemical gypsum powder&POP project project capacity:400,000 tons/year-500,000ton /year 3-project technology:hot air boiling furnace technology This project is one of our domestic projects with a large capacity of 400,000 tons. The raw material is chemical gypsum powder, and use the production process of hot air boiling furnace. This customer's factory is only 1 hour away from our company, and now he is currently building a second production line and its annual production capacity can be 500,000 tons. Actually we have succeeded more than 40 similar projects in our country. |
Case 4: Project name: Gypsum powder&board project Project capacity: 4 factory ,8 lines totally In 2008 year: gypsum powder line 50000 tons/year + gypsum board line 8000000 m2/year In 2009 year: gypsum powder line 150000 tons/year + gypsum board line 10000000 m2/year In 2012 year: gypsum powder line 150000 tons/year + gypsum board line 10000000 m2/year In 2018 year: gypsum powder line 300000 tons/year + gypsum board line 20000000 m2/year Since 2008, the boss purchased 4 gypsum powder projects from us, with capacities ranging from 50,000 tons/year (2008) to 300,000 tons/year (2018). He has now grown to become the largest producer of gypsum building materials in Indonesia, and the quality of his gypsum powder can compete directly with the local Knauf factory and even sell at a higher price. |
Hot air boiling furnace technology is NO.1 In China
100% success rate of domestic and foreign projects
Project site visit and video viewing visit available
Maximum capacity can reach 400,000 to 500,000 tons per year
Over 15 years of experience in oversea market project service experience
1. | Could you dispatch enginners to my plant for installation? Yes, of cause. Our engineers are in Africa to install 5 production lines now. When they finish the project, will go to Uz. |
2. | Could I visit your factory before order? We suggest you visit our running project abroad. Your could choose the one near to you to visit. |
3. | How many days do you need to produce the machines? Generally need about 60 days |
4. | How many days will it take to install the production line? About 90-100 dyas to install and try running |
5. | Could you help train our workers? Yes, our engineers will help on training, and will offer you full set of technology documents. |
Additional support - Raw materials |