Product Description
The EPS light weight panel production line mainly have these parts foaming system, storage system, automatic conveying system, automatic measuring system, mixing system,Casting system, demolding system.The lightweight wall panel machine is not like other machine, it is very flexible, it means if the capacity is small at the beginning , could just buy one or two mold car; if in the future, the market demand is increasing and you want to increase the capacity, then just buy more mold cars. So the investment is also very flexible, so more customers like invest this project.
Video show-detailed info about how this production line works.
https://youtu.be/K-wW5ygdOLc
Finished panel
This kind of machine could produce 4 kinds of panel
Mold car
This kind of production line have two kinds of mold car, one is vertical mold car,
Another is Horizontal mold car, which could produce three kinds of panel. so it means Horizontal mold car could produce all these different panels. i share a picture to you in the attachment.
Compared with this two kinds of mold car, just like the saying' Every coin has two sides'. both the mold car has its own advantage. For Vertical mold car, the biggest advantage is the capacity is large, it means for 2440×610×100mm. For the Horizontal mold car, the biggest advantage is its multi-functional.
Vertical mold car picture
Horizontal mold car picture
This video is about the production process of wall panel machine with Horizontal Mold car, which could help you
have a better understanding about the production process.
https://youtu.be/TDB4Rs3Fl28
1. Cement, fly ash are conveyed to metering silo by screw conveying, and then to the mixer.
2. EPS raw material after foaming through the fluidized bed conveyor to the storage silo, volume
measurement, though air conveying system to mixer;
3. Sand and other additives through the lifting device, to the mixer
4. After mixing, through the pumping device, to the mold car.
5. curing 8hours in the mold car then need demolding, unloading the mold.
6. Stack, natural maintenance for 28 days
Our finished project in 2018
50 sets Horizontal mold car; 60days finished the whole production, now runs well.
This video is about the production process of wall panel machine with Horizontal Mold car, which could help you
have a better understanding about the production process.
https://yurui2018.en.made-in-china.com
Application
Internal walls;
External walls;
Roof
Floor
This video showed how the installation of the panel
https://youtu.be/I7jUUJXQGdc
Advantage of eps concrete wall panel
The biggest advantage is that it could replace the blocks.
How could one new product be accepted by people ? Only the product could help people save time, save energy, much more convenient, price is relatively cheaper than the old one. now for the construction materials, people mainly use block. This kind of machinery produce the bigger panels, mainly used to replace the blocks.
This video could help you better understandign how this production line works.
https://yurui2018.en.made-in-china.com
Comparison between EPS wall panel with Blocks
EPS wall panel:
1. The fire resistance limit is 2.5-3hours,Noncombustion reached the national standard A grade,and can be used in the fireproof building.
2.Whether the frame or steel structure, due to the big board overall installation for use as a wall structure form, so it can be adapted to
larger interlayer displacement angle and greatly enhance the seismic resistance
3.Installation workers construction speed of 60-80 sqm / day
4. It is widely used in public building, office building, hospitals, schools, high-rise residential buildings, workshop, temporary buildings,Non
load-bearing exterior wall in the temporary building, interior walls etc.
Blocks:
1. The fire resistance limit 1 hours
2. Requires masonry and structural reinforcement as a wall material, the seismic resistance is worse than the EPS wall panel
3. Masonry worker masonry speed of 7-10 sqm/day
4. Partition walls, roofing
Installation & Commission
Installation&commissioning staff: 2-3 persons, and buyer also please allocates your workers for installation help.
Remark:If buyer wants to install the machinery by their own workers, can dispatch workers to the project appointed by seller to study. Seller has the responsible to dispatch 1-2 engineers to buyer's project to direct when buyer's installation meet problems.
Production time: 60 working days
Commission and testingtime : 10-15 working days
Contact info
Tel:+8617853992126