Customization: | Available |
---|---|
After-sales Service: | Provided After Sales Service |
Warranty: | 1 Year |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Shandong Yurui group
Sandwich wall panel with calcium silicate board
Raw material detailed introduction |
|
Cement | It it the basic raw material for wall panel. |
Fly ash | 1) reduce the amount of cement 2) increase the area density of the wall panels 3) increase the fluidity of the slurry 4) It can be replaced to cement |
EPS particle | It makes wall panel lighter, higher performance in thermal insulation. |
Surface board | Calcium silicate board or fiber cement board. You can check which kind is available in your market. |
Sand | Add some sand (diameter ≤3mm) improve strength of wall panel. |
Chemical additives | It makes cement foaming, which reduce cement usage quantity |
Note: 1.Others construction rubbish, rice husk, perlite, ties, flyash and so on 2.Using normal cement, no steam curing facilities, the temperature is about 20 °C So for the wall panel's raw material, it is very widely. So this project is higher feasibility in every country. |
Machinery Parameters | |
Configuration: | Automatic metering system |
Capacity | 20,000sqm~600,000sqm per year |
Thickness | 50-250mm thickness. |
Length | 2440~3600mm, |
Width | 610mm , |
Raw materia | There are mainly two different types |
1. Cement+fly ash/eps/ceramsite/sand | |
2. Foamed cement+additives | |
Finished board type | 1. Composite board/sandwich board, with surface board |
2. Lightweight solid panel, without furface board | |
Surface board types | 1. Calcium silicate board |
2. Fiber cement board | |
3. Mgo board |
Our proejct in Middle East
EPS Sandwich wall panel production line production schedule |
||
Commencement date of the contract: Contract production cycle: 45 working days |
||
No. |
Item |
Time node |
1 | Confirmation of planning scheme, Completion of basic drawing and preparatory work. Standard parts, mold car will arrange workshop. |
|
2 | After the customer confirms the plan, we will complete the design of steel structure drawing within one week. The drawings issued in batches to workshop, we will arrange the production |
|
3 | Production on purchasing necessary parts according to the drawing, assembly and commissioning. |
|
4 | Spray paint, packaging | |
5 | Loading to container | |
Loading details: Loading: 40HQ*4 (including 2* 40 HQ and 2* 40OT) |
1. | How to curing the wall panel ? |
Normally curing time is 8-12hours , it can adjust according to your local temperature , also need natural curing around 25-28days before use it . | |
2. | Q: How long is the warranty of your equipment? |
A: 1year ,but we will provide after-sale service the whole life cycle | |
3. | Q: Do you supply spare parts? |
A: Excellent easy broken parts support for buyers. Easy broken parts guarantee for one year. Other parts we will provide price list in advance . |
|
4. | Q: Will you provide trainning and formula? |
A: The training is free of charge , and our engineer will be on duty to train your worker until they know how to produce qualifyed product .Also we will provide you qualified formula | |
5. | Q: How will you provide installation&commissioning |
A: Will provide 2~8persons(adjustable according to the degree of automatic )for installation.Engineers team will go with your project. , besides we only need 15days for commission .in this way can help you save cost on raw material and time . |