Customization: | Available |
---|---|
After-sales Service: | on-Site Installation |
Warranty: | 12 Months |
Still deciding? Get samples of US$ 0/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Qty/mould | 15pcs/mould (hollow block 400*200*200mm) |
Molding cycle | 15s |
Rated pressure | 31MPa |
Main vibration | Platform vibration |
Vibration frequency | 2800-4500 r/m |
Power | 78.5kw |
Pallet size | 1300x1100mm |
Dimension | 11500x2350x2950mm |
Host machine weight | 17500kg |
Factory Area | 3000m² |
hydraulic mixer
1)High-speed mixing, uniform, increase gypsum strength
2)Mix it into a sticky shape and do not burn the motor.
The use of hydraulic mixing, complete sets of equipment installed power of about 24.5KW to save electricity
12 Years experience in oversea market projects service
What we provide is not ONLY the machine BUT the whole system.
Yurui (Shandong) Machinery Co., Ltd, is an enterprise integrating gypsum projects R&D, design, Manufacturing, exportation, installation, and commissioning.1) Pre-sales: Full cooperation with pre-preparation work
2) In-sales: On-time reporting of production progress
3) After-Sales: Lifetime & 24h technical support
Q: How long is the warranty of your equipment?
A: 1 year
Q: Do you supply spare parts?
A: Excellent easy broken parts support for buyers. Easy broken parts guarantee for one year.
Q: Will you provide training?
A: The training is free of charge , and our engineer will be on duty to train your worker.
Q: How will you provide installation&commissioning?
A: Will provide 2~8 persons(adjustable according to the degree of automatic )for installation. Engineers team will go with your project.
Q:How long time for the installation and commissioning?
A: depend on configuration normally only need 15-25 days. Including workers training.