Customization: | Available |
---|---|
After-sales Service: | Yes |
Warranty: | 1 Year |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
*100% success rate of domestic and foreign projects
*Project site visit and video viewing visit available
* Maximum capacity can reach 400,000 to 500,000ton per year
*Over 15 years of experience in oversea market project service experience
1
|
Item Name
|
Gypsum Block Machine
|
2
|
Production Capacity
|
|
4
|
|
Block length:Maximum 667m
|
Block Height:Maximum 500 mm
|
||
Board thickness:60--200mm
|
||
|
Raw Material
|
1-Gypsum Powder :20%
2-Water:80%
Other Additives:Water reducer reinforcement short fiber
|
5
|
Workers
|
Small capacity:2-3 persons
Big Capacity:3-4 Persons
|
|
Natural Curing time
|
Hollow core gypsum block:15 days
Solid gypsum block:30 day
|
|
Workshop
|
Simple configuration : 5*5*7(Height)
High Configuration:12*5*7(Height)
|
|
Storage Area
|
Simple configuration:3000 sqm
High Configuration:6000 sqm
|
|
Installation Time
|
20-30 days
|
Gypsum block cost analysis | |||||||
1 | Gypsum powder | ¥200.00 | Ton | ||||
2 | Water | ¥2.00 | m³ | ||||
3 | Electric | ¥30.00 | Power consumption per hour/unit (30kw*¥1) | ||||
4 | Release agent | ¥7,000.00 | Ton | ||||
5 | Salary | ¥200.00 | per day(8 hours) |
Finished Product
Application
Installation &commissioning service
Q: How long is the warranty of your equipment?
A: 1 year
Q: Do you supply spare parts?
A: Excellent easy broken parts support for buyers. Easy broken parts guarantee for one year.
Q: Will you provide training?
A: The training is free of charge , and our engineer will be on duty to train your worker.
Q: How will you provide installation&commissioning?
A: Will provide 2~8 persons(adjustable according to the degree of automatic )for installation. The engineers team will go with your project.
Q:How long time for the installation and commissioning?
A: depend on configuration normally only needs 15-25 days. Including worker's training.