Customization: | Available |
---|---|
After-sales Service: | Provided After Sales Service |
Warranty: | 3 Year |
Still deciding? Get samples of US$ 0/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Yurui (Shandong) Machinery Co., Ltd, is an enterprise integrating gypsum projects R&D, design, manufacturing, exportation, installation, and commissioning. We devote ourselves to helping customers quickly achieve projects establish and qualified finished products producing with our superior experience and strength in design, manufacturing, installation& commissioning.
We devote ourselves to helping customers save raw materials, and energy, and reduce the cost of production and equipment maintenance in long term with the most advanced gypsum equipment technology and the most mature gypsum production formula.
We have been deeply engaged in the field since 1994, setting up 100+gypsum projects domestic and abroad. Our engineers' group who only serve for YURUI left a full footprint over Africa, Asia, and South America, more than 20+countries.
Product Name |
Gypsum Powder Production line |
Annual capacity |
15,000 to 500,000 tons |
Working time |
24h/day ,300day/year |
Raw Material Gypsum Type |
Natural gypsum ore |
Gypsum powder Mesh |
Within 220 meshes |
Heating method |
Hot air boiling furnace or rotary kiln |
Application of the powder |
Building material like to produce gypsum board , |
Degree of automation |
Fully automatic |
Final product specification |
Gypsum powder |
Fuel for the heating system |
natural gas,coal,diesel,heavy oil,light oil etc |
Packing method available |
1-Packing machine 1-2 mouth 2-Rotary kiln packing machine 3-Iton bag packing machine |
Finished powder bending strength |
2.7 Mpa |
Finished powder compressive strength |
5 Mpa |
Production Process of gypsum powder
Crushing System
Hot air boiling furnace & Thermal oil Boiling furnace Technology Comparison
This is the patent for our engineer's vertical boiling furnance technology-Mr. Xie
One stop service to guarantee you a 100% sucessful project
FAQ
Q
|
How many projects have you installed?
|
A
|
we have installed over 100projects in domestic and abroad.
|
Q
|
How many years experience do you have in mgo field?
|
A
|
Our general engineer has around 20years experience; all others have over 10years experience.
|
Q:
|
Do you supply spare parts?
|
A:
|
Excellent easy broken parts support for buyers. Easy broken parts guarantee for one year.
|
Q:
|
Will you provide trainning?
|
A:
|
The training is free of charge , and our engineer will be on duty to train your worker.
|
Q:
|
How will you provide installation&commissioning?
|
A:
|
Will provide 2~4persons(adjustable according to the degree of automatic )for installation.
|