Customization: | Available |
---|---|
After-sales Service: | Online Support |
Warranty: | 1 Year |
Still deciding? Get samples of US$ 1/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
MGO Board size
|
length :2440-3050mm
|
Width:1220/1200
|
|
Thickness :3-20mm normally, can be adjusted accordingly
|
|
MGO Board type
|
Common mgo board ,Sanding mgo board ,MGO Sulfate Board
|
Raw Material
|
MgO,MgCl2,Fiberglass cloth , non-woven fabric ,sawdust and perlite
|
Equipment Capacity)
|
Max 2000pieces/shift(Size:1220x2440x8mm)
|
Configuration
|
High Automatic
|
Board Application
|
Interior/exterior wall,floor,ceiling,etc
|
Famous Brand Used
|
German Rittal ,SIEMENS
|
Plant Area
|
Area:not less than 5000SQM
|
High :not less than 7meter
|
|
Workman
|
27-39 workers needed ,it depend on different automatic degree
|
First Curing room
|
Time :24h, Temperature:25-35ºC,humidity:60-90%
|
Second Curing room
|
Time :72h,Temperature:35-45ºC,Humidity:60-90%
|
What is MGO board(Magnesium Oxide board)?
- A a new green technologically advanced building material
Q: How long is the warranty of your equipment?
A: 1 year.
Q: Do you supply spare parts?
A: Excellent easy broken parts support for buyers. Easy broken parts guarantee for one year.
Q: Will you provide training?
A: The training is free of charge , and our engineer will be on duty to train your worker.
Q: How will you provide installation & commissioning?
A: Will provide 2~8 persons(adjustable according to the degree of automatic )for installation. Engineers team will go with your project.
Q:How long time for the installation and commissioning?
A: depend on configuration normally only need 15-25 days. Including workers training.
Warmly welcome you contact me for your questions.