Gypsum Powder Machine Line Powder Heating System

Product Details
Customization: Available
After-sales Service: Provided After Sales Service
Warranty: 2 Years
Still deciding? Get samples of US$ 200000/Set
Order Sample
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Manufacturer/Factory & Trading Company

360° Virtual Tour

Secured Trading Service
Diamond Member Since 2018

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Registered Capital
739010.91 USD
Plant Area
1000 square meters
  • Gypsum Powder Machine Line Powder Heating System
  • Gypsum Powder Machine Line Powder Heating System
  • Gypsum Powder Machine Line Powder Heating System
  • Gypsum Powder Machine Line Powder Heating System
  • Gypsum Powder Machine Line Powder Heating System
  • Gypsum Powder Machine Line Powder Heating System
Find Similar Products
  • Overview
  • Company Profile
  • Our Advantages-Yurui
  • Product Parameters
  • Higher quality standard
  • engineer installation
  • Our Advantages
  • After Sales Service
  • Raw material consumption
Overview

Basic Info.

Model NO.
Gypsum Powder Machine Line
Certification
ISO 9001:2008, ISO 9001:2000, CE, Gypsum Powder Making Machine
Crushing Degree
Fine Grinding Machine
Automatic Grade
Automatic
Dryer Technology
Heat Transfer Oil; Hot Air
Fuel
Coal; Diesel; Natural Gas; Heavy Oil
Gypsum Board Thickness
6-22mm
Capacity
30,000 Tons to 400,000 Tons Pmillion
Control System
PLC Center Control
Installation
Guide by Our Engineer
After Sale Service
for Whole Using Life
Voltage
380V 50Hz, Adjust According to Your Country
Workers
5 Person
Sample Projects
South African Uzibekistan Indonesia
MOQ
1 Set
Payment
30% Payment as Advance
Factory
Linyi City Shandong Province
Delivery Time
50-60 Days After Payment
Loading Port
Qingdao
Transport Package
Use Steel Wire Rope to Fix in The Container,
Specification
30, 000 tons to 400, 000 tons per year
Trademark
Yurui
Origin
Shandong, China
HS Code
8474809010
Production Capacity
20sets Per Year

Packaging & Delivery

Package Size
20.00cm * 20.00cm * 3.00cm
Package Gross Weight
100.000kg

Product Description

Company Profile

Yurui (Shandong) Machinery Co., Ltd, is an enterprise integrating gypsum projects R&D, design, manufacturing, exportation, installation, and commissioning. We devote ourselves to helping customers quickly achieve projects establish and qualified finished products producing with our superior experience and strength in design, manufacturing, installation& commissioning.
 

We devote ourselves to helping customers save raw materials, and energy, and reduce the cost of production and equipment maintenance in long term with the most advanced gypsum equipment technology and the most mature gypsum production formula.

We have been deeply engaged in the field since 1994, setting up 100+gypsum projects domestic and abroad. Our engineers' group who only serve for YURUI left a full footprint over Africa, Asia, and South America, more than 20+countries. We hold different projects in each area, offering case visiting on-site. Besides we developed online visiting which breaks the limit of the virus.

Our facory 
Warmly welcome you to visit 


Gypsum Powder Machine Line Powder Heating System

Gypsum Powder Machine Line Powder Heating System

Gypsum Powder Machine Line Powder Heating System
 

Our Advantages-Yurui

Introduction of Gypsum powder production process 
 
Natural gypsum generally includes dihydrate gypsum and anhydrous gypsum. In order to get the valuable materials, generally, we get semi-hydrated gypsum through heating the dihydrate gypsum. Here is the process:

Gypsum Powder Machine Line Powder Heating System
 
The calcined semi-hydrated gypsum powder can widely be used for plasterboard,decoration board, gypsum block, stucco gypsum, and molding gypsum, etc.
 

Paramater of Gypsum Powder Machine line 
 

Product Name
 

Gypsum Powder Production line

Annual capacity

 

15,000 to 500,000 tons

Working time
 

24h/day ,300day/year

Raw Material Gypsum Type
 

Natural gypsum ore

Gypsum powder Mesh
 

Within 220 meshes

Heating method
 

 Hot air boiling furnace or rotary kiln

Application of the powder
 

Building material like to produce gypsum board ,
To make plaster of paris , to make gypsum cornice or ceiling

Degree of automation
 

Fully automatic

Final product specification
 

Gypsum powder

Fuel for the heating system
 

natural gas,coal,diesel,heavy oil,light oil etc

Packing method available

1-Packing machine 1-2 mouth
2-Rotary kiln packing machine
3-Iton bag packing machine

Finished powder bending strength
 

2.7Mpa

Finished powder compressive  strength
 

5Mpa

 

Gypsum Powder Machine Line Powder Heating System

With our machine, our customer can produce the gypsum powder with higher bending strength- 3 MPA 

 

Product Parameters

Production Process of gypsum powder 

Gypsum Powder Machine Line Powder Heating System

Crushing System 
 

The crushing system can crush large ore from mine mining to an average granularity of 25 mm by one time, is an ideal version of traditional ways of two and three stage crushing.  
Gypsum Powder Machine Line Powder Heating System
Milling System 
 
The mill system will make the gypsum particles into gypsum powder,through the combined action of analysis machine and fan, this mill can meet the fineness of grinding requirements from different users.

Gypsum Powder Machine Line Powder Heating System
Calcinating System
 
Calcination system is the key link in the production and processing of gypsum powder, and it is also the most difficult part to master. According to this situation, we have developed a new generation of gypsum powder suitable for various  application - a new type of hot air boiling furnace 
 
Features Of This Hot Air Boiling Furnace Technology 
 
1. Reduce investment
2. Reduce maintenance cost
3. Gypsum powder Quality adjustable
4. The installation period is short and the area is small
5. Energy and power saving
 

Higher quality standard

 

Hot air boiling furnace & Thermal oil Boiling furnace Technology Comparison
 
1 When you switch on and off the production line oftenly:
Thermal oil Technology: When you use this technology, the production line switch off, and he oil is still very hot, about 200 degrees The heat from the oil will take too much time to cool.
 
1) After machine off, the raw material stopped to add: during this cooling time, the heat of oil will be transferred to the exising gypsum powder inside of the furnace. So with too much heat, the powder will be burnt out.
2) When start again , when add some new raw gypsum, then the Calcined gypsum and raw gypsum will all be mixed together.
Then the finished gypsum powder is so uneven.
 
The oil total about 2-3 tons for one production line, with temperature of 200 degree. So when the production line switch off, all these heat will release to the gypsum powder in the boiling furnace. also the release time is very long.
This is why this technology, it is not suitable for some customers that often switch it on and off all the time. 
 
Hot air technology: As when it switches off, It is warming rapidly, cooling faster.  So this technology is easier for customers to switch on and off the production line often. 
 
 
2 The danger of Thermal oil technology:
Sometimes if workers do not notice that the circulation pump of oil does not work, so the hot oil in the tube is heating all the time and not keep cycle status. In this situation, it will happen big explosion.
At beginning the tube of oil will not have leakage oil problem, but after several years of operation, the tube will be aging so it will leak oil and then the dangerous fire will happen in near future.
 
Regards hot air technology no need oil and such kind of problem will not happen, the whole equipment for hot air technology is easy and with less maintenance.
 
3 The gypsum powder industry development:
Before the 2010 year, thermal oil technology was mostly used in China. After 2010 year in China, more and more customer choose the hot air technology as their frist choice. 
Both technology are very mature for gypsum powder production now . 
 
4 For the thermal oil technology: 
 It needs the thermal oil boiler and thermal oil. The boiler is one set of signal boiler, so after you receive it, it can be used directly, no need special treatment in your warehouse.  
 
For the hot air technology, the combustion chamber, it needs to be built with Fire-resistant bricks on your site by our engineer.
Like you said the OMV has rebuilt the combustion already. It is mainly because the bricks have drop down which caused by the light oil sticks on the bricks. Such kind situation very less happens to other projects.
For this part, also we have made some update. such as the brick size was 11cm. Now we are using 23 cm bricks which is bigger twice than before.
 

engineer installation

 

Gypsum Powder Machine Line Powder Heating System
Our engineer Mr, Xie in Indonesia, this  customer in Indonesia who own 4 factories.
He bought 4 sets gypsum powder line and 4 sets gypsum board line from 2008 yeas to 2018 year.
 
In 2008 year: gypsum powder line 50000 tons/year + gypsum board line 8000000 /year
In 2009 year:gypsum powder line 150000 tons/year + gypsum board line 10000000 /year
In 2012 year:gypsum powder line 150000 tons/year + gypsum board line 10000000 /year
In 2018 year:gypsum powder line 300000 tons/year + gypsum board line 20000000 /year
 
This large and long investment involves small,middle and large capacity.The largest capacity even exceed local enterprise KNAUF . All the total 8 production lines are running well now


Gypsum Powder Machine Line Powder Heating System



 

Our Advantages

Technology Advantage for Yurui gypsum powder production line 
 
1. Continuous production: adopt soft starter,to make sure the continuous and stable production.
2. Stable quality: adopt latest hot air boiling furnace technology and cooling system , improve the quality of the product.
3. Energy-saving and stable: core technology cooling system and waste heat utilization system.
4. Equipment performance is high : adopt bag dust collector, frequency converter , Electric, PLC and the national standard cable.
5. The control is sample : use computer display, PLC control.
6. Installation and commissioning period is short ,within 3-7 days.


 
Gypsum Powder Machine Line Powder Heating System1-project name: Chemical  gypsum powder &  phosphogypsum gypsum powde gypsum powder project

2-project capacity:
    Gypsum powder line: 50000 tons/year
    Plaster of Paris line: 30000ton /year 

3-project technology:hot air boiling furnace technology

5-project current situation:Running well

6-Project location: African 

7-Project introduction:
                                                                                                                                                                                             
This is our chemical gypsum powder project in  Africa. The customer is a well-known local building material supplier. The owner has been in the phosphogypsum industry for more than 40 years. They accumulated the phosphogypsum from power plants over the years, and sold to fertilizer plants and smelters after drying.
The customer has independently developed a rotary kiln gypsum powder production line before visiting us, while the finished products produced by their calcination technology could not meet their requirements due to the higher water content of phosphogypsum, 
 
In 2017, the customer came to visit and investigate almost all gypsum powder manufacturers in China, and finally chose us, because the customer was particularly satisfied with our gypsum powder boiling furnace technology and hammer dryer technology. It totally help customer solve their problems of high water content of gypsum powder and unstable quality of finished products.
 
The project has been finished and shipped to customer in March 2018. In September 2018, our engineers went to help customers install the machine, and the main engineer went to test and debug the machine in December 2018. It has only taken 5 days to run the machine and put it into production. Customers are very satisfied.    
                                                                                                                                                                                                                                  
Gypsum Powder Machine Line Powder Heating System

 

After Sales Service

 

One stop service to guarantee you a 100% sucessful project 

1) We will make factory layout after client  got final dimensions  of land. 

2)  After order confirm we will provied CAD  foundation drawing for carry on civil work,if necessary  one civil engineer can be despatch to guide for civil work

3)Provide formular and production tecnology :Our engineers will adjust the formular according to your local raw material 

4) we  will make commisionning and make training for worker until they occupy operate the equipment and produce qualified product   

5) Your enginiers can stay from 6-12 monthes after operation start  
if necessary ,we can arrange one engineer stay in your factory to guide production and management , the buy need pay  the engineer salary  on time . 

6) after project finished , if necessary ,also we can arrange one engineer stay in your factory to help produce and manage the plant . 

Gypsum Powder Machine Line Powder Heating SystemGypsum Powder Machine Line Powder Heating System
 

Raw material consumption

No name Unit data
1 Annual capacity of  gypsum powder
 
T For example-60,000 tons per year 
2 Working days /year
 
day  300 working day
3 Annual consumption of gypsum ore
 
Ton
 
69,000 tons per year 
4 Gypsum ore consumption for one ton of finished gypsum powder
 
Ton 1.15
5 Consumption of electric for one ton of finished gypsum powder
 
Degree/ton 28-30 degree 
6 Consumption of Natural gas for one ton of finished gypsum powder
 
CBM 18-20 CBM 
7 Consumption of coal for one ton of finished gypsum powder
 
KG 30kg 

(5500cal)
8 Consumption of diesel for one ton of finished gypsum powder
 
KG 18 kg
(10,000 cla)


Gypsum Powder Machine Line Powder Heating System

You can also use phosphogypsum as main raw materials 
Gypsum Powder Machine Line Powder Heating System
FAQ
Q
How many projects have you installed?
A
we have installed over 100projects in domestic and abroad.
 
Q
How many years experience do you have in mgo field?
A
Our general engineer has around 20years experience; all others have over 10years experience.
 
Q:
Do you supply spare parts?
A:
Excellent easy broken parts support for buyers. Easy broken parts guarantee for one year.
 
Q:
Will you provide trainning?
A:
The training is free of charge , and our engineer will be on duty to train your worker.
 
Q:
How will you provide installation&commissioning?
A:
Will provide 2~4persons(adjustable according to the degree of automatic )for installation.
 

Company advantages & Contact

Rich experience
We have rich experience in gypsum board making equipment field. Our general engineer has over 20years experience, other main engineers all have over 10years experience, proficient in the newest gypsum board manufacturing plant design and manufacturing. With over 100 projects in domestic and abroad markets, we can ensure you a successful project. 

Professional teamwork
1.Sales team: 24hours online for you
2. Designing team: design the best layout for you
3. Manufacturing team: promise the best quality with high precision
4. Installation & commissioning team: finish the installation and testing of whole line
5. Process team: promise you the qualfied formula.

Excellent Service
Our company provides full life-cycle value services for gypsum board making equipment design, cost accounting, installation and operation, equipment maintenance and the whole life cycle technical support



Sherry 
 
For our company, we mainly focus on gypsumproduction line projects. 
According to our experience in the overseas market for many years, we know clearly that for the project, what customers expect is the  "ready to go" package solutions available.
 
The 'ready to go, means the whole integrated solution, which could guarantee you could start the production of gypsum products successfully and gain more local market share.
 
Our philosophy is to control all the questions within our factory, Keep the complexity to ourselves, and keep the simplicity to the customer. 
 
The machine is only the START for the whole project, the final target for both of us is that this gypsum project is to produce the qualified gypsum products in your factory
 
 
Smile

director, her family business is related to gypsum industry for more than 20 years and she is mainly in charge of marketing in our group company 
 
She has been to visit African projects for many times so very confident in gypsum business in this market 
 
Here she also is clear about your idea and requirements, then we can work together to offer you best project solution and suport you in this gypsum business .

Gypsum Powder Machine Line Powder Heating System

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier