Customization: | Available |
---|---|
After-sales Service: | Provided After Sales Service |
Warranty: | Provided After Sales Service |
Still deciding? Get samples of US$ 100/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
More details of MGO board making machine & fiber cement board production line
If you are producing Fiber cement board or you has some customers who wants to produce fiber cement board?
Here I would like to share you the most advanced technology to produce the fiber cement board.
Our technology is Flow Slurry- Roll Forming Process
The whole production process is no need High Temperature , No need the High Pressure!
Why I must introduce this new technology to you? As we know the common fiber cement board has some disadvantages in installation, delivery and too easy to crack.
So for our technology, it can produce higher quality kind fiber cement board, which is much lightweight, better performance in bending strength and flexibility! Also save much cost in installation as it is easy to cut in working site also with lightweight so save delivery cost for customers.
What's more, the investment on our production line is much less than traditional production machine. So with less investment on this project, you can produce a higher advantages fiber cement board than others! Let you occupy much local markets!
Our technology is Flow Slurry- Roll Forming Process
The whole production process is no need High Temperature , No need the High Pressure!
Why I must introduce this new technology to you? As we know the common fiber cement board has some disadvantages in installation, delivery and too easy to crack.
What's more, the investment on our production line is much less than traditional production machine. So with less investment on this project, you can produce a higher advantages fiber cement board than others! Let you occupy much local markets!
1 | Finished Product |
Standard board and Premium Sanding fiber cement board |
|||||||
2 | Product Specification |
(2440-3050)*(1220)*(3-20)mm | |||||||
3 | Designed Capacity |
2800 sheets per day | |||||||
4 | Workshop Requirements |
10000 Building area: 10,000 square meters (including raw material area, production area, curing area, and finished product area). Plant height ≥ 6 meters, Mixing area height ≥ 9.5 meters |
|||||||
5 | Design transformer installed capacity |
630KVA | |||||||
6 | Designed production water consumption |
40 Ton/ Shift | |||||||
7 | Design compressed air consumption |
8 cbm/min | |||||||
8 | Natural gas consumption |
400 cbm/day(based on 0°C, winter season) | |||||||
9 | Design and production labours |
around 25/shift(Aslo should based on to production process requirements) | |||||||
10 | Total Cost |
(Excluding factory buildings, infrastructure, freight, working capital, transformers, lighting and power lines, etc.) |
Machinery Parameters | |
Configuration: | Automatic metering system |
Capacity | 4000 sheets per day |
MGO board Thickness | 3-25mm |
MGO board Length | 2440~3600mm, |
MGO board Width | 1220mm |
Raw materia | 1 MGO powder |
2 Sulfate | |
3 fliber glass mesh | |
Finished board type | 1. MGO board |
2. fiber cement board |
FAQ
1. | How to curing MGO board? |
There are two times curing MGO board :First curing is : 12 hours, The second curing is 48 hours | |
2. | Q: How long is the warranty of your equipment? |
A: 1year ,but we will provide after-sale service the whole life cycle | |
3. | Q: Do you supply spare parts? |
A: Excellent easy broken parts support for buyers. Easy broken parts guarantee for one year. Other parts we will provide price list in advance . |
|
4. | Q: Will you provide trainning and formula? |
A: The training is free of charge , and our engineer will be on duty to train your worker until they know how to produce qualifyed product .Also we will provide you qualified formula | |
5. | Q: How will you provide installation&commissioning |
A: Will provide 2~8persons(adjustable according to the degree of automatic )for installation.Engineers team will go with your project. , besides we only need 15days for commission .in this way can help you save cost on raw material and time . |