Hot Air Technology Vertical Furnance Gypsum Powder Calcination Production Line

Product Details
Customization: Available
After-sales Service: Provided After Sales Service
Warranty: 2 Years
Still deciding? Get samples of $ !
Order Sample
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Manufacturer/Factory & Trading Company

360° Virtual Tour

Secured Trading Service
Diamond Member Since 2018

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Registered Capital
739010.91 USD
Plant Area
1000 square meters
  • Hot Air Technology Vertical Furnance Gypsum Powder Calcination Production Line
  • Hot Air Technology Vertical Furnance Gypsum Powder Calcination Production Line
  • Hot Air Technology Vertical Furnance Gypsum Powder Calcination Production Line
  • Hot Air Technology Vertical Furnance Gypsum Powder Calcination Production Line
  • Hot Air Technology Vertical Furnance Gypsum Powder Calcination Production Line
  • Hot Air Technology Vertical Furnance Gypsum Powder Calcination Production Line
Find Similar Products
  • Overview
  • Product Description
  • Detailed Photos
  • Company Profile
  • After Sales Service
  • Sample project from Yurui
Overview

Basic Info.

Model NO.
gypsum powder production line
Certification
ISO 9001:2008, RoHS, CE, ISO9001: 2000
Control Type
PLC
Crushing Degree
Fine Grinding Machine
Automatic Grade
Automatic
Raw Material
Gypsum Stone or Chemical Gypsum
Main Market
MID Asia, Africa, South American
Loading Port
Qingdao
Engineer Experience
More Than 30 Years
Factory Location
Linyi City Shandong Province
Factory Land Size
60,000 Sqm
Factory Workers
300 Workers
Main Markets
Africa, MID East
Engineer
with 20 Years Experience in MGO Board Production
Fuel
Oil Natural Gas and Coal
Per Year Production Capacity
30000 Tons -500,000 Tons Per Year
Workers Demand
4-5 Workers
Factory Size
2200 Sqm
Factory Height
14-16 Meters
After Sales Service
Engineers Will Go to Your Factory to Do Installati
Transport Package
Loose Package in Container
Specification
based on production capacity
Trademark
YURUI
Origin
Shandong, China
HS Code
8474809000
Production Capacity
20 Sets Per Year

Packaging & Delivery

Package Size
300.00cm * 200.00cm * 100.00cm
Package Gross Weight
100.000kg

Product Description



 

Product Description

Natural Gypsum Powder Production Line

Natural gypsum generally includes dihydrate gypsum and anhydrous gypsum. In order to get the valuable materials, generally, we get semi-hydrated gypsum through heating the dihydrate gypsum.

Hot Air Technology Vertical Furnance Gypsum Powder Calcination Production Line
Introduction of Gypsum powder production line 
 
Natural gypsum generally includes dihydrate gypsum and anhydrous gypsum. In order to get the valuable materials, generally, we get semi-hydrated gypsum through heating the dihydrate gypsum. Here is the process:
 
The calcined semi-hydrated gypsum powder can widely be used for plasterboard,decoration board, gypsum block, stucco gypsum, and molding gypsum, etc.
Hot Air Technology Vertical Furnance Gypsum Powder Calcination Production Line


 

Paramater of Gypsum Powder Machine
 

Product Name
 

Gypsum Powder Production line

Annual capacity
 

15,000 to 500,000 tons

Working time
 

24h/day ,300day/year

Raw Material Gypsum Type
 

Natural gypsum ore

Gypsum powder Mesh
 

Within 220 meshes

Heating method
 

 Hot air boiling furnace or rotary kiln

Application of the powder
 

Building material like to produce gypsum board ,
To make plaster of paris , to make gypsum cornice or ceiling

Degree of automation
 

Fully automatic

Final product specification
 

Gypsum powder

Fuel for the heating system
 

natural gas,coal,diesel,heavy oil,light oil etc

Packing method available

1-Packing machine 1-2 mouth
2-Rotary kiln packing machine
3-Iton bag packing machine

Finished powder bending strength
 

2.7Mpa-3MPA 

Finished powder compressive  strength
 

5Mpa


Detailed Photos

Hot Air Technology Vertical Furnance Gypsum Powder Calcination Production Line

Vercical boiling furnance, also named as Boiling Calciner

Boiling Calciner is an indirect and efficient calcination equipment for fluidized calcination of certain fineness of gypsum dihydrate powder and dehydration to make gypsum hemihydrate. Calcined dihydrate raw material is natural gypsum dihydrate powder or industrial by-product gypsum dihydrate powder and its heating medium is flue gas. The heat source required for calcination is hot flue gas, steam, heat-conducting oil, electric auxiliary heat and other heat transfer media. The structural design of boiling calciner is in line with JC/T2581-2021 standard of gypsum building materials industry.


The bed state of the boiling calciner belongs to the bubbling bed, so the furnace is figuratively called "boiling calciner".

Boiling calciner calcination furnace calcination part of a vertical straight barrel container at the bottom of a gas distribution board, gas distribution board can be designed porous plate or there are many small hood.

The purpose is to support the solid powder in the shutdown work without powder leakage, in the work of the gas flow from the bottom evenly into the bed. There are overflow holes on the furnace wall at the upper interface of the bed for discharge. In the bed layer is equipped with a large number of heating tubes, the heating medium in the tubes is flue gas or other hot media, the heat is transferred to the fluidized gypsum powder outside the tubes through the tube wall, and the gypsum powder is dehydrated and decomposed.

In normal operation, air is drummed in from the bottom of the boiling calciner and enters the fluidized bed through the gas distribution plate. Drum into the air does not need a lot, slightly more than the critical gas velocity, so that the bed to achieve fluidization can be. At this time submerged in the fluidized bed in the heating tube to the material to transfer a large amount of heat, so that the gypsum dihydrate powder to reach the temperature of dehydration decomposition, gypsum dihydrate in the fluidized bed to remove the water of crystallization and become steam, these vapors and the bottom of the furnace drummed into the air mixed together, through the bed upward movement. Since the amount of steam is much more than the drummed-in air, the fluidization of the whole bubbling bed is mainly realized by the steam formed by gypsum dehydration. Because of the intense tumbling and mixing of the powder in the fluidized bed, the temperature and composition of the material are almost the same everywhere in the whole fluidized bed.

The raw gypsum powder continuously put into the bed, as soon as it enters the bed, almost instantly mixes evenly with a large amount of hot material in the bed, and rapidly dehydrates and decomposes in the hot powder material. In order to avoid premature short-circuiting and discharge of the just-entered raw material without completing the dewatering process, a partition is sandwiched in the furnace at the time of design, dividing the fluidized bed into two parts of large and small, and the bottom of the two parts is connected. The raw gypsum powder line enters the large part, where most of the crystalline water is removed, and then enters the small part through the lower channel, where the final dehydration process is completed, and then automatically overflows out of the upper part of the bed.




Hot Air Technology Vertical Furnance Gypsum Powder Calcination Production Line
 

Company Profile

 

Yurui (Shandong) Machinery Co., Ltd, is an enterprise integrating gypsum projects R&D, design, manufacturing, exportation, installation, and commissioning. We devote ourselves to helping customers quickly achieve projects establish and qualified finished products producing with our superior experience and strength in design, manufacturing, installation& commissioning.
 

We devote ourselves to helping customers save raw materials, and energy, and reduce the cost of production and equipment maintenance in long term with the most advanced gypsum equipment technology and the most mature gypsum production formula.

1994 +

year

since 1994

100

+

100+gypsum projects

20 +

+

More than 20+ countries
We are not a machinery provider,but an overall solution provider.

 

We focus on the demands of users, never stop updating, improving, and surpassing.

 

We pursue extreme cost performance, not only price.

We have been deeply engaged in the field since 1994, setting up 100+gypsum projects domestic and abroad. Our engineers' group who only serve for YURUI left a full footprint over Africa, Asia, and South America, more than 20+countries. We hold different projects in each area, offering case visiting on-site. Besides we developed online visiting which breaks the limit of the virus.
Hot Air Technology Vertical Furnance Gypsum Powder Calcination Production LineHot Air Technology Vertical Furnance Gypsum Powder Calcination Production LineHot Air Technology Vertical Furnance Gypsum Powder Calcination Production Line

After Sales Service

Our Advantages to provide gypsum powder production line 

Rich Experience

Experience in Gypsum Technology Research Since 1994

Until the 2022 year, our company has been deeply working on gypsum projects for 25 years. Lots of critical technology developed by our group, such as boiling furnace, only our technology could support gypsum powder project of capacity 400000 tons/year

Experience of 100+ Projects Manufacture &Install Abroad And Domestic

Since 1994, we manufactured and installed more than 100 projects. So we could provide support from your start to researching your project to produce qualified finished products.

Professional Team

Experts Provide Professional Design For The Project

As we know, professional design is the 1st step to ensure a project is successful. We could dispatch our engineer abroad to explore on-site if the customer requires it.

Experienced Installation Group Gets Projects Into Production Quickly

How do we ensure the fact installation? Besides the "people", we provide the installation documents which accompany our machinery, such as Installation tools list,Installation Estimated Schedule list. In addition, we extra provide all the relevant documents to enhance your production, such as Responsibilities and Assignment Statement,Maintenance Manual and Raw Material and Spare part List.

Market Department Members Provide Professional and Efficient Communication

We set up a zoom meeting once customers need support to transfer information between engineers accurately.

The Whole Group Provide A Powerful One-Stop Sourcing Service

We assist our customers in the procurement of all relevant spare parts, saving them time to the greatest extent and preventing downtime due to spare parts. At the same time, we ensure the maximum adaptability of the parts purchased later to the original equipment.

Full Range of Services

Pre-Sales: Full Cooperation With Pre-Preparation Work

In addition to the technical aspects of the project itself, our support also includes assisting clients in obtaining feasibility reports, government approvals, bank approvals, etc.

In-Sales: On-Time Reporting of Production Progress

You could inspect the production of your machine through photos and videos for the whole procedure.

After-Sales: Lifetime & 24h Technical Support

We offer a lifetime of technical support. Feel free to contact us for help with any technical issues,24 h available. We will also visit customers regularly to help them solve problems and assist to update formulas and equipment.

Irreplaceable Advantages

Case Projects Visiting Abroad On-Site & Online

We help our customers to train workers and guide production. Even we could arrange one engineer to help client run the factory for 1-2 years if customer require. Of cause it's available for that customer dispatch engineer to study on our side.

Training To Workers & Engineers

You could inspect the production of your machine through photos and videos for the whole procedure.

Spare Part and Raw Material Supplying

We will prepare backup copies of the main wearing parts and send them to the customer with the equipment.

Sample project from Yurui

Hot Air Technology Vertical Furnance Gypsum Powder Calcination Production LineHot Air Technology Vertical Furnance Gypsum Powder Calcination Production LineHot Air Technology Vertical Furnance Gypsum Powder Calcination Production LineHot Air Technology Vertical Furnance Gypsum Powder Calcination Production Line


 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier