Customization: | Available |
---|---|
After-sales Service: | Provided After Sales Service |
Warranty: | 1 Year |
Still deciding? Get samples of US$ 100/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Equipment parameters
Request for the raw material | |||||
Name | Specification | Package | Kg /package | 20'container loading quantity |
Remark |
PVC film | width :1.230m one roll =600m |
Roll | 57kg | 86340sqm/70200m/ 117rolls /6670kg |
|
Aluminum foil | length:1.230m One roll =125kgs=10000m |
Roll | 125kg | 180rolls/1800000m/ 23000kg |
1 kg could stick about 100sqm gypsum board |
Glue for PVC | 50kgs/barrel | Barrel | 50kg | 410barrels/20500kg | 1kg could stick 35~40sqm |
Glue for aluminum | 50kgs/barrel | Barrel | 50kg | 410barrels/20500kg | 1kg could stick 58~64sqm |
Remark:The above information is just for your reference. |
Technology
Gypsum PVC ceiling machine we designed has national invention patent, and it's high degree of automation.
What we provide is not ONLY the machine BUT the whole system.
1) Pre-sales: Full cooperation with pre-preparation work
2) In-sales: On-time reporting of production progress
3) After-Sales: Lifetime & 24h technical support
Q: How long is the warranty of your equipment?
A: 1 year
Q: Do you supply spare parts?
A: Excellent easy broken parts support for buyers. Easy broken parts guarantee for one year.
Q: Will you provide training?
A: The training is free of charge , and our engineer will be on duty to train your worker.
Q: How will you provide installation&commissioning?
A: Will provide 2~8 persons(adjustable according to the degree of automatic )for installation. Engineers team will go with your project.
Q:How long time for the installation and commissioning?
A: depend on configuration normally only need 15-25 days. Including workers training.
In different automatic production line, the total workers quantity is not same, normally need 6-9 workers for 1 working shift.
We can train your local workers until they can operate the machine very stable.
NO. |
production areas |
How many workers needed? |
1 | Forklift operator |
1 worker (This worker must know how to operate the forklift ) |
2 | Laminating machine part |
3 workers 2 workers need to change the pvc film together (15-20 mins need to change one roller of pvc film) In the two workers, one worker also need to cut the pvc film by blade The third worker operates the control cabinet to turn on/off the laminated line. When the above two workers change the pvc film, the lamination line need to power off, so this is why need the third worker. |
3 | cutting line |
1 worker usually the last pcs of gypsum board on a pallet is a scrap board used as a backing board, and this work needs to take this board out, otherwise it will be mixed into the finished product. The worker also need to operate the control cabinet of cutting line |
4 | edge taping machine |
1 worker Inspect unqualified ceiling board, and take them out. Replace edge tapes roller when it uses out |
5 | put the carton box on each bag of ceiling |
2 workers |
6 | packagea and Stacking |
1 worker (this work can be same worker with the Forklift operator) |
Total |
8-9 workers |