Customization: | Available |
---|---|
After-sales Service: | Provided |
Warranty: | 1 Year |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make at Made-in-china.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Product name | China Factory Price Excellent Quality Gypsum Plaster of Paris Powder Making Machine Plaster board making machine |
Production capacity |
2million~30 million square meter per year.
Normally Production capacity based on thickness 9.5 mm
|
Working time | Based on 24 h per day ,300 days per year. |
Final product variety | (1)Common paper-faced plasterboard (2)Fire resistance paper-covered plasterboard (3)Water resistance paper-covered plasterboard. |
Product specification | Board length:2000--3600mm Board width:1200mm,1220mm Board thickness:8--25mm |
Fuel type | Heavy Oil ,Diesel,Natural Gas,Wood Normal customer could choose type is cheaper and easy to get locally. |
Technology type | 1-Hot air technology
2-Hot oil technology
|
Gypsum board production technology is relatively mature, as long as you are looking for a responsible factory that can help you get your project built, but if you want to produce high quality gypsum board, you need to consider the following aspects:
Q: How long is the warranty of your equipment?
A: 1year
Q: Do you supply spare parts?
A: Excellent easy broken parts support for buyers. Easy broken parts guarantee for one year.
Q: Will you provide training?
A: The training is free of charge , and our engineer will be on duty to train your worker.
Q: How will you provide installation&commissioning
A: Will provide 2~8 persons(adjustable according to the degree of automatic )for installation. Engineers team will go with your project.
Q:How long time for the installation and commissioning
A: depend on configuration normally only need 15-25days. Including workers training.